After outgrowing their current facility, Saints Peter & Paul issued a Request for Proposal (RFP) in 2019 for a new High School complex, to be located adjacent to the existing Saints Peter & Paul Church in Easton, MD.
We partnered with Willow Construction and prepared a bid to supply & erect over 60,000 sf of pre-engineered metal building systems – 11 different buildings packaged together to make one overall metal building. Willow was awarded the project as the General Contractor, and we soon got to work ordering the buildings and working with the design team.